Technical documents

30 November 2016
The Transition Plan describes the processes, the activities, the plans and measures that will be applied by the Network Manager and the operational...
30 November 2016
This report is a factual high-level comparison of Air Navigation Services (ANS) provision costs in Europe and the United States of America (US),...
22 November 2016
The new Airport Capacity Assessment Methodology (ACAM) manual of the Network Manager provides a common methodology on how to assess airport capacity...
3 October 2016
This EUROCONTROL specification defines and documents the data requirements for the Air Transport Operators Data Flow in support of the regular...
8 September 2016
The Network Performance Plan (NPP) for Reference Period 2 (RP2) contains performance targets for all relevant key performance areas and for all...
DocumentSize
PDF icon Network Performance Plan 2015 -2019934.18 KB
1 September 2016
This Fligh Test Campaign (FTC) focuses on the following specifications: performance assessment on State aircraft operating in a PBN environment on...
1 September 2016
The digital NOTAM concept aims at complementing the provision of text-based ICAO NOTAM messages with the provision of structured data, based on the...

Pages